Merlin CRITICAL PATH 1998 VS Rotec DUAL SPORT 1998 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Rotec Dual Sport 1998 comparison online with competitors

Rotec Dual Sport

General Infos
Model Dual Sport
Manufacturer Rotec
Year of production 1998
Current price Check price Here ==>   
Color choice -Black and red and yellow fade
Sizes - Rider can adjust manually

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Michelin Wild Gripper Lite-S Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Levers
Hayes Hydraulic Disc Brake System Brakes
Hubs for disc brakesHayes and Hugi
Rims manufacturer 32-hole
Sun Rims Rhyno Lite
Spoke nipples typeSplined Alloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
DT Stainless Steel

Frame and Body Specs

Frame materials6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionTitec Enduro Hell Bent
Handlebar extenderOptional
Handlebar stem detailsRotec Custom
Headset size1 1/8 (inches) Threadless Aheadset

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell widthRotec Custom
Bottom bracket type 122 (millimeters) Spindle
Rotec Sealed Bearing
Crankset parts and sizes 22/32/42 Teeth
Shimano Deore XT
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 12 - 32 Teeth
8-speed

Rotec Dual Sport Fork System Data

Derailleur (Front) Bottom Bracket Mount
Sachs Neos
Derailleur (Rear)Shimano Deore XT GS
Fork material Double Triple-clamp Crown
Aluminum
Fork typeWhite Brothers DC 118

Other Specs of Rotec Dual Sport

Component group setsShimano Deore XT
Pedals detailsShimano PD-M636 SPD
Rear shock absorber 4.5 (inches) Travel
Fox Vanilla TC
Saddle seat Titanium Rails
SDG Ventura Comp
Seat post extension 27.2 (millimeters) Diameter
Thomson Elite


Useful links and guides ....