Merlin CRITICAL PATH 1998 VS Salsa BIG MAMA XT 2010 specs comparison
🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price
➜ Salsa Big Mama XT price
Merlin Critical Path
General Infos| Model | Critical Path |
| Manufacturer | Merlin |
| Year of production | 1998 |
| Current price | 🛒 View Price → |
| Color choice | -Brushed |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
| Hubs for disc brakes | Shimano XTR |
| Rims manufacturer | 32-holeMavic 217 SUP |
| Spoke nipples type | Alloy Nipples |
| Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
| Frame materials | 3Al and 2.5V Titanium |
| Frame type | TIG-welded |
| Handlebar construction | Syncros Hardcore |
| Handlebar extender | Optional |
| Handlebar stem details | Syncros Hardcore |
| Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
| Bottom bracket shell width | 68 (millimeters) English |
| Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
| Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
| Gear shift levers | Shimano XTR RapidFire SL |
| Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
| Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
| Derailleur (Rear) | Shimano XTR SGS |
| Fork material | Triple-clamp CrownAluminum and magnesium |
| Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
| Component group sets | Shimano XTR |
| Pedals details | Optional |
| Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
| Saddle seat | Bontrager With Titanium Rails |
| Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Salsa Big Mama XT
General Infos| Model | Big Mama XT |
| Manufacturer | Salsa |
| Year of production | 2010 |
| Current price | 🛒 View Price → |
| Color choice | -Orange Funk |
| Sizes | - Small - Medium - Large - Extra large |
Wheels And Breaking System
| Bike front tire | 29 X 2.35 (inches) Kenda Nevegal |
| Bike rear tire | Not Available |
| Bike wheel size | 29 (inches) Wheels |
| Brakeset type | Shimano XT Hydraulic LeversShimano XT Disc With 180 (millimeters) Rotor Front and Shimano XT Disc With 160 (millimeters) Rotor Rear Brakes |
| Hubs for disc brakes | Shimano XT 6-bolt Disc |
| Rims manufacturer | 32-hole and 36-holeSalsa Semi 29'er Disc |
| Spoke nipples type | Brass |
| Spoke wheel | 14/15ga. ButtedDT Swiss Stainless |
Frame and Body Specs
| Frame materials | Scandium With AL-7000 Linkage |
| Frame type | TIG-welded |
| Handlebar construction | Salsa ProMoto Flat |
| Handlebar extender | Optional |
| Handlebar stem details | Race Face Deus XC 31.8 |
| Headset size | 1 1/8 (inches) Cane Creek S-3 |
Gearing Specifications
| Bicycle chain | Shimano HG93 |
| Bottom bracket shell width | Not Available |
| Bottom bracket type | Race Face X-Type |
| Crankset parts and sizes | 22/32/44 TeethRace Face Deus |
| Gear shift levers | Shimano XT Rapid Fire |
| Rear gear set | 11 - 34 Teeth9-speed |
Salsa Big Mama XT Fork System Data
| Derailleur (Front) | Shimano XT |
| Derailleur (Rear) | Shimano XT |
| Fork material | Single CrownMagnesium and aluminum |
| Fork type | 100 (millimeters) TravelFox F29RL |
Other Specs of Salsa Big Mama XT
| Component group sets | Shimano XT |
| Pedals details | Not Available |
| Rear shock absorber | 4 (inches) TravelFox Float RP2 |
| Saddle seat | WTB Rocket V |
| Seat post extension | 31.6 (millimeters) DiameterRace Face Deus XC |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Salsa Big Mama XT manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Salsa Big Mama XT Mountain bike here