Merlin CRITICAL PATH 1998 VS Santa Cruz BULLIT LX\XT DISC 2000 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Santa Cruz Bullit LX\XT Disc 2000 comparison online with competitors

Santa Cruz Bullit LX\XT Disc

General Infos
Model Bullit LX\XT Disc
Manufacturer Santa Cruz
Year of production 2000
Current price Check price Here ==>   
Color choice - Lime Green
- Metallic Blue
- Metallic Green
- Polished
- Red
- Scuba Yellow
- Silver
- Trans Red - Trans Blue
- White
-Black
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) IRC Mythos XC Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Levers
Hayes Hydraulic Disc Brakes
Hubs for disc brakesShimano Deore XT Disc
Rims manufacturer 32-hole
Rear: Bontrager Valiant Assymetric
Front: Bontrager Valiant
Spoke nipples typeAlloy Nipples
Spoke wheel Double-butted
DT Stainless Steel

Frame and Body Specs

Frame materials Double-butted
7005 Aluminum
Frame typeTIG-welded
Handlebar constructionAzonic 1.5 (inches) Riser
Handlebar extenderOptional
Handlebar stem detailsTitec Big AL
Headset size1 1/8 (inches) Threadless Aheadset AL

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG72
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 113 (millimeters) Spindle
Shimano BB-ES70
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore LX
Gear shift leversShimano Deore LX RapidFire SL
Rear gear set 11 - 34 Teeth
9-speed

Santa Cruz Bullit LX\XT Disc Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano Deore LX Top-swing
Derailleur (Rear)Shimano Deore XT SGS
Fork material Triple-clamp Crown
Aluminum
Fork type 5.0 (inches) Travel
Marzocchi Bomber Z-1 BAM

Other Specs of Santa Cruz Bullit LX\XT Disc

Component group setsShimano Deore LX and XT
Pedals detailsOptional
Rear shock absorber 6.0 (inches) Travel
Fox Vanilla RC
Saddle seatFi'zi:k: Nisene Ti
Seat post extension 28.6 (millimeters) Diameter
Thomson Elite


Useful links and guides ....