Merlin CRITICAL PATH 1998 VS Santa Cruz V FREE R FREERIDE 2004 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Santa Cruz V Free R Freeride
General InfosModel | V Free R Freeride |
Manufacturer | Santa Cruz |
Year of production | 2004 |
Current price | Check price Here ==> |
Color choice | -Not found |
Sizes | - Not available |
Wheels And Breaking System
Bike front tire | 26 X 2.35 (inches) Intense DH Sticky |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid SD 5 LeversAvid Mechanical Disc Brakes |
Hubs for disc brakes | DT Swiss Onyx Disc |
Rims manufacturer | 32-holeMavic EX 729D |
Spoke nipples type | Brass Nipples |
Spoke wheel | 14ga. Straight GaugeDT Stainless Steel |
Frame and Body Specs
Frame materials | Aluminum |
Frame type | TIG-welded |
Handlebar construction | Easton EA-70 |
Handlebar extender | Not Available |
Handlebar stem details | Easton Vice |
Headset size | 1 1/8 (inches) Threadless Dia Compe HS0218 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-HG73 |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ GIGA Pipe DH |
Crankset parts and sizes | 22/32 TeethTruVativ Holzfeller |
Gear shift levers | Shimano Deore LX RapidFire |
Rear gear set | 11 - 32 Teeth9-speed |
Santa Cruz V Free R Freeride Fork System Data
Derailleur (Front) | Shimano Deore LX |
Derailleur (Rear) | Shimano Deore XT SGS |
Fork material | Dual CrownAluminum and magnesium |
Fork type | Marzocchi Jr. T |
Other Specs of Santa Cruz V Free R Freeride
Component group sets | Mountain Mix |
Pedals details | Optional |
Rear shock absorber | Not Available |
Saddle seat | WTB Rocket V-Comp |
Seat post extension | Easton EA50 |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Santa Cruz V Free R Freeride manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Santa Cruz V Free R Freeride Mountain bike here