Merlin CRITICAL PATH 1998 VS Schwinn ROCKET 88 STAGE 3 2000 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Schwinn Rocket 88 Stage 3 2000 comparison online with competitors

Schwinn Rocket 88 Stage 3

General Infos
Model Rocket 88 Stage 3
Manufacturer Schwinn
Year of production 2000
Current price Check price Here ==>   
Color choice -Black on Black
Sizes - 17 (inches)
- 19 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Michelin Wild Gripper XL
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore Levers
Shimano Deore V-Brake Brakes
Hubs for disc brakes Rear: Shimano Alivio
Front: Schwinn Race Lace
Rims manufacturer 28-hole and 32-hole
Mavic X221
Spoke nipples typeNot Available
Spoke wheel 1.8 (millimeters) Straight Gauge
DT Stainless Steel

Frame and Body Specs

Frame materials6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionTitec Hell Bent XC
Handlebar extenderOptional
Handlebar stem detailsTitec Lil' AL
Headset size1 1/8 (inches) Threadless Tange-Seiki STE

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG72
Bottom bracket shell widthNot Available
Bottom bracket typeShimano BB-ES70
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore
Gear shift leversShimano Deore Rapidfire Plus
Rear gear set 11 - 32 Teeth
9-speed

Schwinn Rocket 88 Stage 3 Fork System Data

Derailleur (Front)Shimano Deore
Derailleur (Rear)Shimano Deore XT SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork type 2.5 (inches)-4.0 (inches) Adjustable Travel
Rock Shox Judy Race

Other Specs of Schwinn Rocket 88 Stage 3

Component group setsMountain Mix
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox SID
Saddle seatSDG Belair
Seat post extensionJD Components 495


Useful links and guides ....