Merlin CRITICAL PATH 1998 VS Scott RANSOM 10 2007 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Scott Ransom 10 2007 comparison online with competitors

Scott Ransom 10

General Infos
Model Ransom 10
Manufacturer Scott
Year of production 2007
Current price Check price Here ==>   
Color choice -Not found
Sizes - Not available

Wheels And Breaking System

Bike front tire26 X 2.40 (inches) Scott Stroke
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy 7 Levers
Avid Juicy 7 With 203 (millimeters) Rotor Front and Avid Juicy 7 With 185 (millimeters) Rotor Rear Brakes
Hubs for disc brakes Rear: DT Swiss Disc
Front: Scott EC 20 (millimeters) Thru Axle
Rims manufacturer 32-hole
DT Swiss E540
Spoke nipples typeNot Available
Spoke wheelDT Swiss Black

Frame and Body Specs

Frame materialsCarbon
Frame typeMonocoque
Handlebar constructionTruVativ Team Alloy
Handlebar extenderOptional
Handlebar stem detailsThomson Elite X4
Headset sizeSyncros Race

Gearing Specifications

Bicycle chainShimano CN-HG73
Bottom bracket shell widthNot Available
Bottom bracket typeShimano XT Hollowtech II
Crankset parts and sizes 22/32/44 Teeth
Shimano XT
Gear shift leversSRAM X.9 Trigger
Rear gear set 11 - 32 Teeth
9-speed

Scott Ransom 10 Fork System Data

Derailleur (Front)Shimano XT
Derailleur (Rear)SRAM X.0
Fork material Single Crown
Aluminum and magnesium
Fork type 115 - 160 (millimeters) Adjustable Travel
RockShox Lyrik

Other Specs of Scott Ransom 10

Component group setsMountain Mix
Pedals detailsCrank Brothers Acid 1.0
Rear shock absorber 165 (millimeters) Travel
Scott Equalizer TC
Saddle seatScott EC CR-MO
Seat post extensionScott RC 03-20


Useful links and guides ....