Merlin CRITICAL PATH 1998 VS Scott RANSOM LIMITED 2008 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Scott Ransom Limited 2008 comparison online with competitors

Scott Ransom Limited

General Infos
Model Ransom Limited
Manufacturer Scott
Year of production 2008
Current price Check price Here ==>   
Color choice -Carbon and Light Green
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.40 (inches) Schwalbe Nobby Nic
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy Ultimate Carbon Levers
Avid Juicy Ultimate With 203 (millimeters) Rotor Front and Avid Juicy Ultimate With 185 (millimeters) Rotor Rear Brakes
Hubs for disc brakes 12 (millimeters)
20 (millimeters)
Rear: DT Swiss EX144 N'Duro LTD
Front: DT Swiss EX144 N'Duro LTD
Rims manufacturerDT Swiss EX144 N'Duro LTD
Spoke nipples typeNot Available
Spoke wheelDT Swiss

Frame and Body Specs

Frame materialsCarbon
Frame typeMonocoque
Handlebar constructionTruVativ Team Carbon
Handlebar extenderNot Available
Handlebar stem detailsThomson Elite X4
Headset size1 1/8 (inches) Threadless Syncros Race

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
SRAM PC-991
Bottom bracket shell width73 (millimeters) English
Bottom bracket typeTruvativ GXP Team
Crankset parts and sizes 22/32/44 Teeth
Truvativ Noir 3.3 TM GXP
Gear shift leversSRAM X.0 Trigger
Rear gear set 11 - 32 Teeth
9-speed

Scott Ransom Limited Fork System Data

Derailleur (Front) Clamp On 31.8 (millimeters)
Shimano XTR
Derailleur (Rear)SRAM X.0
Fork materialSingle
Fork type 120 - 160 (millimeters) Adjustable Travel
Fox 36 Talas RC2

Other Specs of Scott Ransom Limited

Component group setsMountain Mix
Pedals detailsCrank Brothers Acid 2.0
Rear shock absorber 165 (millimeters) Travel
Scott Equalizer TC
Saddle seat CROM Rails
Scott EC
Seat post extension 34.9 (millimeters) Diameter
Maverick Speedball Adjustable


Useful links and guides ....