Merlin CRITICAL PATH 1998 VS Scott VOLTAGE FR20 2010 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Scott Voltage FR20
General InfosModel | Voltage FR20 |
Manufacturer | Scott |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-Brown and Gold |
Sizes |
- Short - Long |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.40 (inches) Schwalbe Big Betty DH Triple Nano Front: 26 X 2.40 (inches) Schwalbe Big Betty DH Gooey Gluey |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Elixer 5 Levers Avid Elixer 5 With 203 (millimeters) Rotor Front and Avid Elixer 5 With 185 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | 20 (millimeters) Rear: Formula DHL-135 12 (millimeters) and 135 (millimeters) Thru Axle Front: Scott Comp |
Rims manufacturer | 32-hole Alex FR 32 |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Straight Gauge DT Swiss Champion Stainless Steel |
Frame and Body Specs
Frame materials | 6061 Hydroformed Aluminum |
Frame type | TIG-welded |
Handlebar construction | 710 (millimeters) Scott Pilot FR 1.5 Pro 38 (millimeters) Rise |
Handlebar extender | Optional |
Handlebar stem details | 40 (millimeters) Truvativ Hussefelt OS 0-degree |
Headset size | Semi-integrated FSA Orbit E 1.5R 1.5 (inches) Reducer To 11/8 (inches) |
Gearing Specifications
Bicycle chain | Shimano HG53 |
Bottom bracket shell width | 73 (millimeters) |
Bottom bracket type | Truvativ Howitzer XR |
Crankset parts and sizes | 34 Teeth TruVativ Hussefelt 1.0 |
Gear shift levers | SRAM X.5 Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Scott Voltage FR20 Fork System Data
Derailleur (Front) | Chain Retention Device E.thirteen SS ISCG05 Chainguide With Supercharger |
Derailleur (Rear) | SRAM X.7 Mid Cage |
Fork material | Single |
Fork type | 180 (millimeters) Travel RockShox Domain 302 Coil |
Other Specs of Scott Voltage FR20
Component group sets | Mountain Mix |
Pedals details | Wellgo B087 SCT |
Rear shock absorber | 165-180 (millimeters) Adjustable Travel Fox Van R Coil |
Saddle seat | Scott Voltage FR 8 (millimeters) Rails |
Seat post extension | 31.6 (millimeters) Diameter Scott DJ Zero Offset |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Scott Voltage FR20 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Scott Voltage FR20 Mountain bike here