Merlin CRITICAL PATH 1998 VS Specialized DEMO 8 II 2009 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |

Specialized Demo 8 II
General InfosModel | Demo 8 II |
Manufacturer | Specialized |
Year of production | 2009 |
Current price | Check price Here ==> |
Color choice |
-Ano Blue Cheetah |
Sizes |
- Small - medium - large |
Wheels And Breaking System
Bike front tire | 26 X 2.30 (inches) Specialized Chunder SX |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Elixir R Carbon Levers Avid Elixir R Carbon With 203 (millimeters) Rotor Front and Avid Elixir R Carbon With 185 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | Rear: Specialized Thru-axle Front: Specialized Hi Lo Disc |
Rims manufacturer | 32-hole DT Swiss F550 |
Spoke nipples type | Brass Nipples |
Spoke wheel | 14/15/14ga. Butted DT Swiss Competition Stainless Steel |
Frame and Body Specs
Frame materials | Specialized M5 ORE Aluminum and Magnesium |
Frame type | TIG-welded |
Handlebar construction | Specialized Demo Riser 31.8 (millimeters) |
Handlebar extender | Optional |
Handlebar stem details | Specialized Aggro |
Headset size | 1 1/8 (inches) Cartridge |
Gearing Specifications
Bicycle chain | SRAM PC-971 |
Bottom bracket shell width | 73 (millimeters) |
Bottom bracket type | Truvativ Howitzer XR |
Crankset parts and sizes | 36 Teeth TruVativ Holzfeller |
Gear shift levers | SRAM X.9 Trigger |
Rear gear set | 12 - 26 Teeth 9-speed |
Specialized Demo 8 II Fork System Data
Derailleur (Front) | Chain Retention Device Gamut P-30 Chain Guide |
Derailleur (Rear) | SRAM X.0 |
Fork material | Dual Crown Magnesium and aluminum |
Fork type | 200 (millimeters) Travel Fox 40 RC2 |
Other Specs of Specialized Demo 8 II
Component group sets | SRAM Mix |
Pedals details | Specialized Lo Pro Mag |
Rear shock absorber | 8.2 (inches) Travel Fox DHX 5.0 Coil |
Saddle seat | Specialized Enduro |
Seat post extension | 30.9 (millimeters) Diameter Thomson |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Specialized Demo 8 II manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Specialized Demo 8 II Mountain bike here