Merlin CRITICAL PATH 1998 VS Specialized ENDURO PRO FSR 2002 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |

Specialized Enduro Pro FSR
General InfosModel | Enduro Pro FSR |
Manufacturer | Specialized |
Year of production | 2002 |
Current price | Check price Here ==> |
Color choice | -Silver |
Sizes | - Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.20 (inches) Specialized New Enduro |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Hayes Hydraulic Disc LeversHayes Hydraulic Disc Brakes |
Hubs for disc brakes | Rear: DT Swiss OnyxFront: Specialized Stout |
Rims manufacturer | 32-holeMavic X317 Disc |
Spoke nipples type | Aluminum Nipples |
Spoke wheel | 15ga. Double-buttedDT Stainless Steel |
Frame and Body Specs
Frame materials | Specialized A1 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Specialized LowRise |
Handlebar extender | Optional |
Handlebar stem details | Specialized Riser |
Headset size | 1 1/8 (inches) Threadless Specialized Cartridge |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-HG53 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 113 (millimeters) SpindleShimano BB-ES70 |
Crankset parts and sizes | 22/32/44 TeethSpecialized Strong Arm II |
Gear shift levers | Shimano Deore XT RapidFire SL |
Rear gear set | 11 - 34 Teeth9-speed |
Specialized Enduro Pro FSR Fork System Data
Derailleur (Front) | Top-pull and clamp-on 35.0 (millimeters)Shimano Deore XT |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Single Triple-clamp CrownAluminum |
Fork type | 3.15 (inches)-5.00 (inches) Adjustable TravelRock Shox Psylo SL |
Other Specs of Specialized Enduro Pro FSR
Component group sets | Mountain Mix |
Pedals details | Shimano PD-M515 SPD |
Rear shock absorber | 4.00 (inches) - 5.25 (inches) Adjustable TravelFox Custom |
Saddle seat | Specialized Body Geometry Pro |
Seat post extension | 30.9 (millimeters) DiameterAluminum |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Specialized Enduro Pro FSR manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Specialized Enduro Pro FSR Mountain bike here