Merlin CRITICAL PATH 1998 VS Specialized EPIC COMP 29ER 2011 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Specialized Epic Comp 29er
General InfosModel | Epic Comp 29er |
Manufacturer | Specialized |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-Lime and Blk |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | Rear: 29 X 1.95 (inches) S-Works Renegade Front: 29 X 2.0 (inches) S-Works The Captain |
Bike rear tire | Not Available |
Bike wheel size | 29 (inches) Wheels |
Brakeset type | Avid Elixir R SL Levers Avid Elixir R SL Brakes |
Hubs for disc brakes | Specialized Hi Lo Disc |
Rims manufacturer | 32-hole DT Swiss X450SL |
Spoke nipples type | Not Available |
Spoke wheel | 15ga. Straight Gauge DT Swiss Champion Stainless Steel |
Frame and Body Specs
Frame materials | M5 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Specialized XC Flat 31.8 (millimeters) |
Handlebar extender | Optional |
Handlebar stem details | Specialized XC |
Headset size | 1 1/8 (inches) - 1 1/2 (inches) Campy Spec Integrated Sealed Cartridge Bearing |
Gearing Specifications
Bicycle chain | KMC X10 |
Bottom bracket shell width | Not Available |
Bottom bracket type | SRAM GXP |
Crankset parts and sizes | 22/33/44 Teeth SRAM Carbon S-1250 |
Gear shift levers | SRAM X.7 |
Rear gear set | 11 - 36 Teeth 10-speed |
Specialized Epic Comp 29er Fork System Data
Derailleur (Front) | S3 Direct Mount SRAM X.7 |
Derailleur (Rear) | SRAM X.9 |
Fork material | Single Crown Alloy Steerer |
Fork type | 100 (millimeters) Travel RockShox Reba RLT 29 |
Other Specs of Specialized Epic Comp 29er
Component group sets | SRAM Mix |
Pedals details | Resin Test Ride Pedals |
Rear shock absorber | 100 (millimeters) Travel Fox Mini-Brain |
Saddle seat | Specialized BG Phenom Comp |
Seat post extension | 30.9 (millimeters) Diameter Alloy Single Bolt Setback |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Specialized Epic Comp 29er manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Specialized Epic Comp 29er Mountain bike here