Merlin CRITICAL PATH 1998 VS Specialized EPIC MARATHON CARBON 2008 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Specialized Epic Marathon Carbon 2008 comparison online with competitors

Specialized Epic Marathon Carbon

General Infos
Model Epic Marathon Carbon
Manufacturer Specialized
Year of production 2008
Current price Check price Here ==>   
Color choice -Carbon and Orange
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Specialized Fast Track Control LK
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type 160 (millimeters) Rear Brakes
185 (millimeters) Front and Magura Marta
Magura Marta Levers
Magura Marta
Hubs for disc brakes Rear: DT Swiss
Front: Specialized Hi Lo Disc
Rims manufacturer 28-hole and 32-hole
DT Swiss XR 4.2D
Spoke nipples typeAlloy Niples
Spoke wheel 2.0/1.7/1.8 Butted
DT Swiss Stainless Steel

Frame and Body Specs

Frame materials M5 Aluminum Rear Triangle
FACT 9m Carbon Triangle
Frame typeTIG-welded and bonded
Handlebar construction 31.8
6 Up
640 (millimeters) Wide
8 Back
Specialized OS XC Low Rise Carbon Bar
Handlebar extenderOptional
Handlebar stem details 3D Forged With CNC Finish
31.8 (millimeters) Clamp
Specialized
Headset size1 1/8 (inches) Threadless Campy Spec Integrated Sealed Cartridge Bearing

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
SRAM PC-971 With Power Link
Bottom bracket shell widthNot Available
Bottom bracket typeShimano XT
Crankset parts and sizes 22/32/44 Teeth
Shimano M-770 XT
Gear shift leversSRAM X-0 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Specialized Epic Marathon Carbon Fork System Data

Derailleur (Front) Dual-pull and clamp-on 34.9 (millimeters)
Shimano XT
Derailleur (Rear)SRAM X-0
Fork material Single Crown
Aluminum
Fork type 100 (millimeters) Travel
Fox F100 RLC

Other Specs of Specialized Epic Marathon Carbon

Component group setsMountain Mix
Pedals detailsCrank Brothers Smarty
Rear shock absorber 100 (millimeters) Travel
Specialized AFR Flow Control
Saddle seat Ti Rails
Specialized Phenom
Seat post extension 30.9 (millimeters) Diameter
Thomson Setback


Useful links and guides ....