Merlin CRITICAL PATH 1998 VS Specialized MYKA FSR EXPERT 2008 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Specialized Myka FSR Expert
General InfosModel | Myka FSR Expert |
Manufacturer | Specialized |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice |
-Blue |
Sizes |
- Womens S - womens M - womens L |
Wheels And Breaking System
Bike front tire | Rear: 26x2.00 (inches) S-Works The Captain Sport Front: 26 X 2.00 (inches) S-Works The Captain Sport |
Bike rear tire | Not Available |
Bike wheel size | Rear: 26x2.00 (inches) Wheels Front: 26 (inches) |
Brakeset type | Avid Juicy 3 SL Levers Avid Juicy 3 Hydraulic With 160 (millimeters) Rotor Brakes |
Hubs for disc brakes | Rear: Shimano M475 Front: Specialized Hi Lo Disc |
Rims manufacturer | 32-hole DT Swiss 445SD |
Spoke nipples type | Alloy Niples |
Spoke wheel | 15ga. Straight Gauge DT Swiss Stainless Steel |
Frame and Body Specs
Frame materials | M4 Aluminum |
Frame type | TIG-welded |
Handlebar construction | 31.8 6 Up 620 (millimeters) Wide 8 Back Specialized OS XC Low Rise |
Handlebar extender | Optional |
Handlebar stem details | 31.8 Clamp 7 Degree Rise Specialized 3d Forged Alloy |
Headset size | 1 1/8 (inches) Threadless Threadless |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) KMC HG-50 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano BB-ES25 |
Crankset parts and sizes | 22/32/44 Teeth Shimano M521 |
Gear shift levers | Shimano Deore M530 |
Rear gear set | 11 - 34 Teeth 9-speed |
Specialized Myka FSR Expert Fork System Data
Derailleur (Front) | Clamp On 34.9 (millimeters) Shimano M530 |
Derailleur (Rear) | Shimano Shadow XT M770 |
Fork material | Single Crown Aluminum and magnesium |
Fork type | 100 (millimeters) Travel RockShox Recon 335 SL |
Other Specs of Specialized Myka FSR Expert
Component group sets | Mountain Mix |
Pedals details | Shimano PD-M505 SPD |
Rear shock absorber | 100 (millimeters) Travel X Fusion 02RC |
Saddle seat | 143 (millimeters) Width Specialized Women's XC |
Seat post extension | 30.9 (millimeters) Diameter Two-bolt Alloy Micro-Adjust |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Specialized Myka FSR Expert manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Specialized Myka FSR Expert Mountain bike here