Merlin CRITICAL PATH 1998 VS Specialized S-WORKS STUMPJUMPER FSR ALU 2006 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |

Specialized S-Works Stumpjumper FSR Alu
General InfosModel | S-Works Stumpjumper FSR Alu |
Manufacturer | Specialized |
Year of production | 2006 |
Current price | Check price Here ==> |
Color choice |
-Not found |
Sizes |
- Not available |
Wheels And Breaking System
Bike front tire | 120 TPI Aramid Bead Dual Compound 26 X 2.00 (inches) Specialized Adrenaline Pro |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | 6 (inches) XT Rotor Brakes Shimano XT Levers Hydraulic Disc Metallic Pads Shimano XTR |
Hubs for disc brakes | Mavic Crossmax SL Disc |
Rims manufacturer | Mavic Crossmax SL Disc |
Spoke nipples type | Not Available |
Spoke wheel | Specialized |
Frame and Body Specs
Frame materials | M5 Aluminum |
Frame type | TIG-welded and bonded |
Handlebar construction | 6 Degree Upsweep 640 (millimeters) 8 Degree Backsweep Specialized OS Carbon Rise |
Handlebar extender | Optional |
Handlebar stem details | 31.8 (millimeters) Clamp 5 Degree Thomson CNC Alloy |
Headset size | 10 (millimeters) Insertion Alloy Cups Cartridge Bearing 1 1/8 (inches) Threadless |
Gearing Specifications
Bicycle chain | Shimano CN-7701 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano XTR |
Crankset parts and sizes | 2-piece Crank and BB 22A and 32A and 44A Teeth Shimano M960 XTR |
Gear shift levers | Carbon and aluminum SRAM X.0 Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Specialized S-Works Stumpjumper FSR Alu Fork System Data
Derailleur (Front) | 34.9 (millimeters) Clamp Dual Pull Top Swing Shimano XTR |
Derailleur (Rear) | 9-speed SRAM X.0 |
Fork material | Single Crown Magnesium and aluminum |
Fork type | 90-130 (millimeters) Fox Talas RLC |
Other Specs of Specialized S-Works Stumpjumper FSR Alu
Component group sets | Mountain Mix |
Pedals details | Optional |
Rear shock absorber | 120 (millimeters) Travel Fox Remote Brain Fade |
Saddle seat | Ti Rails Body Geometry Rival |
Seat post extension | 2-bolt Adjustable 30.9 (millimeters) Diameter 7000 Series Aluminum Set Back Head Thomson |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Specialized S-Works Stumpjumper FSR Alu manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Specialized S-Works Stumpjumper FSR Alu Mountain bike here