Merlin CRITICAL PATH 1998 VS Specialized STUMPJUMPER FSR 2004 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Specialized Stumpjumper FSR
General InfosModel | Stumpjumper FSR |
Manufacturer | Specialized |
Year of production | 2004 |
Current price | Check price Here ==> |
Color choice |
-Carbon |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.00 (inches) Specialized Roll-X |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid SD 5 Levers Avid Single Digit 3 Brakes |
Hubs for disc brakes | Rear: Shimano HB-M525 Front: Specialized Stout |
Rims manufacturer | 28-hole and 32-hole Mavic XM117 |
Spoke nipples type | Brass Nipples |
Spoke wheel | 15ga. Straight Gauge DT Stainless Steel |
Frame and Body Specs
Frame materials | Specialized M4 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Specialized Aluminum |
Handlebar extender | Optional |
Handlebar stem details | Specialized Riser |
Headset size | 1 1/8 (inches) Threadless Aluminum |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG53 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 121 (millimeters) Spindle Shimano BB-ES30 |
Crankset parts and sizes | 22/32/44 Teeth Shimano Deore XT |
Gear shift levers | Shimano Deore RapidFire |
Rear gear set | 11 - 32 Teeth 9-speed |
Specialized Stumpjumper FSR Fork System Data
Derailleur (Front) | Clamp-on and 34.9 (millimeters) Shimano Deore LX |
Derailleur (Rear) | Shimano Deore XT SGS |
Fork material | Single Crown Aluminum |
Fork type | 100 (millimeters) Travel Answer Manitou Black Elite |
Other Specs of Specialized Stumpjumper FSR
Component group sets | Mountain Mix |
Pedals details | Shimano PD-M515 SPD |
Rear shock absorber | Fox Float R |
Saddle seat | Specialized Body Geometry Pro |
Seat post extension | 30.9 (millimeters) Diameter Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Specialized Stumpjumper FSR manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Specialized Stumpjumper FSR Mountain bike here