Merlin CRITICAL PATH 1998 VS Specialized STUMPJUMPER FSR ELITE 2008 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Specialized Stumpjumper FSR Elite
General InfosModel | Stumpjumper FSR Elite |
Manufacturer | Specialized |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice |
- Black and Mag -Red |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.00 (inches) S-Works The Captain |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | 185 (millimeters) Rear Brakes 203 (millimeters) Front and Avid Ultimate 7 Disc Avid Ultimate 7 Levers Avid Ultimate 7 Disc |
Hubs for disc brakes | Rear: DT Swiss Front: Specialized Hi Lo Disc |
Rims manufacturer | 28-hole and 32-hole DT Swiss X420 |
Spoke nipples type | Alloy Niples |
Spoke wheel | 14/15ga. Double-butted DT Swiss Stainless Steel |
Frame and Body Specs
Frame materials | M5 Aluminum |
Frame type | TIG-welded |
Handlebar construction | 31.8 6 Up 640 (millimeters) Wide 8 Back Specialized OS XC Low Rise 2014 Alloy Bar |
Handlebar extender | Optional |
Handlebar stem details | 3D Forged With CNC Finish 31.8 (millimeters) Clamp Specialized |
Headset size | 1 1/8 (inches) Threadless Threadless |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) SRAM PC-971 With Power Link |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano XT |
Crankset parts and sizes | 22/32/44 Teeth Shimano M-762 XT |
Gear shift levers | Shimano LX |
Rear gear set | 11 - 34 Teeth 9-speed |
Specialized Stumpjumper FSR Elite Fork System Data
Derailleur (Front) | DMD and top-swing Shimano LX |
Derailleur (Rear) | Shimano Shadow XT M770 |
Fork material | Single Crown Aluminum |
Fork type | 120 (millimeters) Travel Fox F120 RL |
Other Specs of Specialized Stumpjumper FSR Elite
Component group sets | Mountain Mix |
Pedals details | Crank Brothers Smarty |
Rear shock absorber | 120 (millimeters) Travel Fox Triad Custom For FSR |
Saddle seat | Hollow Cr-Mo Rails Specialized XC MTB |
Seat post extension | 30.9 (millimeters) Diameter Single Bolt Setback 2014 Butted Alloy |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Specialized Stumpjumper FSR Elite manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Specialized Stumpjumper FSR Elite Mountain bike here