Merlin CRITICAL PATH 1998 VS Titus MOTO LITE (BASE KIT) 2006 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Titus Moto Lite (Base Kit) 2006 comparison online with competitors

Titus Moto Lite (Base Kit)

General Infos
Model Moto Lite (Base Kit)
Manufacturer Titus
Year of production 2006
Current price Check price Here ==>   
Color choice - Baby Blue Powder (Limited)
- Frosty Pink Powder (Limited)
- Metallic Gun Metal Gray Powder
- Pearl White Powder
- Red Powder (Limited)
-Unspecified
Sizes - Extra small
- Small
- Medium
- Large

Wheels And Breaking System

Bike front tireKenda
Bike rear tireNot Available
Bike wheel sizeNot Available
Brakeset type Avid Juicy 5 Levers
Avid Juicy 5 Brakes
Hubs for disc brakesBontrager Select Disc
Rims manufacturerBontrager Select
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsAluminum
Frame typeTIG-welded
Handlebar constructionTitus 6061 Riser
Handlebar extenderNot Available
Handlebar stem detailsTitus Forged
Headset size1 1/8 (inches) Threadless WTB Momentum Comp ST

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG53
Bottom bracket shell widthNot Available
Bottom bracket typeTruvativ
Crankset parts and sizesTruvativ Firex XR
Gear shift leversSRAM X.7
Rear gear set 11 - 34 Teeth
9-speed

Titus Moto Lite (Base Kit) Fork System Data

Derailleur (Front)Shimano Deore LX
Derailleur (Rear)SRAM X.7
Fork material Single Crown
Aluminum and magnesium
Fork type 90 - 130 (millimeters) Adjustable Travel
Fox Talas R

Other Specs of Titus Moto Lite (Base Kit)

Component group setsMountain Mix
Pedals detailsNot Available
Rear shock absorber4 (inches) - 5 (inches) Adjustable Travel
Saddle seatWTB Rocket V Comp
Seat post extensionTitus Micro-adjust


Useful links and guides ....