Merlin CRITICAL PATH 1998 VS Tomac 80 MAGNUM 1999 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Tomac 80 Magnum 1999 comparison online with competitors

Tomac 80 Magnum

General Infos
Model 80 Magnum
Manufacturer Tomac
Year of production 1999
Current price Check price Here ==>   
Color choice -Guards Red
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Tioga Factory DH Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Magura Gustav M Levers
Magura Gustav M Disc Brakes
Hubs for disc brakesMavic Dee Max Disc
Rims manufacturer 36-hole
Mavic Dee Max
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Mavic Stainless Steel

Frame and Body Specs

Frame materialsEaston Custom Magnum
Frame typeMIG-welded
Handlebar constructionProfile
Handlebar extenderOptional
Handlebar stem detailsProfile
Headset size1 1/8 (inches) Threadless Race Face Real Seal

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Sachs SC-M90
Bottom bracket shell width110 (millimeters) English
Bottom bracket type 145 (millimeters) Spindle
Race Face Taperlock
Crankset parts and sizesRace Face Turbine DH
Gear shift leversSRAM ESP 9.0 SL Rear
Rear gear set 11 - 28 Teeth
9-speed

Tomac 80 Magnum Fork System Data

Derailleur (Front) Chain Retention Device
Mr. Dirt Chainguide
Derailleur (Rear)SRAM ESP 9.0 SL
Fork material Double Triple-clamp Crown
Aluminum and magnesium
Fork type 3.15 (inches) Travel
Answer Manitou X-Vert Carbon

Other Specs of Tomac 80 Magnum

Component group setsMountain Mix
Pedals detailsAtomic Flatboy
Rear shock absorber 3.15 (inches) Travel
Answer Bazooka Big Shaft
Saddle seatTioga Multicontrol XL
Seat post extension 31.6 (millimeters) Diameter
Profile


Useful links and guides ....