Merlin CRITICAL PATH 1998 VS Trek FUEL EX 8 WSD 2010 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Trek Fuel EX 8 WSD 2010 comparison online with competitors

Trek Fuel EX 8 WSD

General Infos
Model Fuel EX 8 WSD
Manufacturer Trek
Year of production 2010
Current price Check price Here ==>   
Color choice -Black Pearl
Sizes - Womens 14.5 (inches)
- womens 15.5 (inches)
- womens 16.5 (inches)
- womens 17.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.20 (inches) Bontrager XDX
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Elixer 5 Hydraulic Levers
Avid Elixer 5 Disc Brakes
Hubs for disc brakes Rear: Shimano M525-L
Front: Bontrager Select
Rims manufacturerBontrager Duster
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsWSD Alpha Red Aluminum
Frame typeTIG-welded
Handlebar constructionBontrager Race Riser
Handlebar extenderOptional
Handlebar stem detailsBontrager Race Lite
Headset size1 1/8 (inches) - 1 1/2 (inches) FSA No. 57E

Gearing Specifications

Bicycle chainNot Available
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 44/32/22 Teeth
Shimano M542
Gear shift leversShimano SLX
Rear gear set 11 - 32 Teeth
9-speed

Trek Fuel EX 8 WSD Fork System Data

Derailleur (Front)Shimano SLX
Derailleur (Rear)Shimano Deore XT Shadow
Fork material Single Crown Crown
Alloy
Fork type 120 (millimeters) Travel
Fox 32 F-series RL

Other Specs of Trek Fuel EX 8 WSD

Component group setsMountain Mix
Pedals detailsCrank Brothers Custom Candy C
Rear shock absorber 120 (millimeters) Travel
Fox Float RP2
Saddle seatBontrager Race WSD
Seat post extension 31.6 (millimeters) Diameter
Bontrager Race


Useful links and guides ....