Merlin CRITICAL PATH 1998 VS Trek HIFI DELUXE 2011 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Trek HiFi Deluxe 2011 comparison online with competitors

Trek HiFi Deluxe

General Infos
Model HiFi Deluxe
Manufacturer Trek
Year of production 2011
Current price Check price Here ==>   
Color choice -Matte Crystal Pearl Whhite and Titanite Black
Sizes - 15.5 (inches)
- 17.5 (inches)
- 19 (inches)
- 21 (inches)
- 23 (inches)

Wheels And Breaking System

Bike front tire29 X 2.1 (inches) Bontrager 29-2
Bike rear tireNot Available
Bike wheel size29 (inches) Wheels
Brakeset typeAvid Elixir 5
Hubs for disc brakes Rear: Shimano Alloy M525
Front: Bontrager FCC
Rims manufacturer 28-hole and 32-hole
Rear: Bontrager Mustaing Disc 29
Front: BOntrager Mustang Disc 29
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsAlloy
Frame typeTIG-welded
Handlebar constructionBontrager Race Lite Big Sweep
Handlebar extenderOptional
Handlebar stem detailsBontrager Race Lite
Headset sizeFSA No. 57 Orbit

Gearing Specifications

Bicycle chainNot Available
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 22/32/44 Teeth
Shimano M552
Gear shift leversSRAM X.7
Rear gear set 11 - 36 Teeth
10-speed

Trek HiFi Deluxe Fork System Data

Derailleur (Front) Direct Mount
Shimano SLX
Derailleur (Rear)SRAM X.9
Fork materialSingle
Fork type 100 (millimeters) Travel
Fox F100 RL 29

Other Specs of Trek HiFi Deluxe

Component group setsSRAM X.7
Pedals detailsOptional
Rear shock absorberFox Float RP2
Saddle seatBontrager Evoke 2
Seat post extension 31.6 (millimeters) Diameter
Bontrager Race


Useful links and guides ....