Merlin CRITICAL PATH 1998 VS Trek REMEDY 9.7 2011 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Trek Remedy 9.7 2011 comparison online with competitors

Trek Remedy 9.7

General Infos
Model Remedy 9.7
Manufacturer Trek
Year of production 2011
Current price Check price Here ==>   
Color choice -Svelte Black
Sizes - 15.5 (inches)
- 17.5 (inches)
- 18.5 (inches)
- 19.5 (inches)
- 21.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.3 (inches) Bontrager XR3 Expert
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type SRAM X.7 Levers
Avid Elixir R Brakes
Hubs for disc brakesDT Swiss M 1800
Rims manufacturer 32-hole
DT Swiss M 1800
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsCarbon
Frame typeBonded and monocoque
Handlebar constructionBontrager Race Lite Low Riser
Handlebar extenderOptional
Handlebar stem detailsBontrager Rhythm
Headset sizeFSA No.57E

Gearing Specifications

Bicycle chainNot Available
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 22/32/44 Teeth
SRAM Carbon
Gear shift leversSRAM X.7
Rear gear set 12 - 36 Teeth
10-speed

Trek Remedy 9.7 Fork System Data

Derailleur (Front)SRAM X.7
Derailleur (Rear)SRAM X.9
Fork material Single Crown
Alloy
Fork type 120-150 (millimeters) Adjustable Travel
Fox 32 Talas FIT RL

Other Specs of Trek Remedy 9.7

Component group setsSRAM X.7
Pedals detailsOptional
Rear shock absorber 150 (millimeters) Travel
Fox Float RP-23
Saddle seatBontrager Evoke 2
Seat post extension 31.6 (millimeters) Diameter
Bontrager Rhythm Elite


Useful links and guides ....