Merlin CRITICAL PATH 1998 VS Trek STP 300 2001 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Trek STP 300 2001 comparison online with competitors

Trek STP 300

General Infos
Model STP 300
Manufacturer Trek
Year of production 2001
Current price Check price Here ==>   
Color choice -Red
Sizes - Large
- medium
- xlarge

Wheels And Breaking System

Bike front tireBontrager Super-X
Bike rear tireNot Available
Bike wheel sizeNot Available
Brakeset type Shimano Deore XT RapidFire SL Levers
Avid Single Digit 20 Brakes
Hubs for disc brakesRolf Urraco
Rims manufacturer Rear: Rolf Urraco Assymetric
Front: Rolf Urraco
Spoke nipples typeNot Available
Spoke wheel 2.0 (millimeters) Double-butted
DT Stainless Steel

Frame and Body Specs

Frame materialsOCLV Carbon Fiber
Frame typeBonded
Handlebar constructionICON Graphite
Handlebar extenderOptional
Handlebar stem detailsICON Graphite
Headset sizeAheadset SAS

Gearing Specifications

Bicycle chain1/2 X 3/32 (inches)
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 22/32/44 Teeth
ICON Graphite
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 11 - 32 Teeth
9-speed

Trek STP 300 Fork System Data

Derailleur (Front)Shimano Deore XT
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork type 3.15 (inches) Travel
Rock Shox Sid XC

Other Specs of Trek STP 300

Component group setsMountain Mix
Pedals detailsBontrager Re-Entry
Rear shock absorber 1.25 (inches) Travel
Rock Shox SID Adjust
Saddle seatBontrager FS 2000
Seat post extensionICON Graphite


Useful links and guides ....