Merlin CRITICAL PATH 1998 VS Trek TOP FUEL 69ER 2008 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Trek Top Fuel 69er 2008 comparison online with competitors

Trek Top Fuel 69er

General Infos
Model Top Fuel 69er
Manufacturer Trek
Year of production 2008
Current price Check price Here ==>   
Color choice -Gloss Black
Sizes - 15.5 (inches)
- 17.5 (inches)
- 19.5 (inches)
- 21.5 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 2.20 (inches) Bontrager Jones XR
Front: 29 X 2.25 (inches) Bontrager Jones XR
Bike rear tireNot Available
Bike wheel size Rear: 26 (inches) Wheels
Front: 29 (inches)
Brakeset type Avid Juicy 5 Levers
Avid Juicy 5 Hydraulic With 160 (millimeters) Rotor Brakes
Hubs for disc brakesBontrager Race
Rims manufacturer Rear: Bontrager Race Disc
Front: Bontrager Race Disc 29
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsAlpha Red Aluminum
Frame typeTIG-welded
Handlebar constructionBontrager Race
Handlebar extenderOptional
Handlebar stem detailsBontrager Select OS
Headset sizeCane Creek ZS-2

Gearing Specifications

Bicycle chainNot Available
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 22/32/44 Teeth
Shimano LX
Gear shift leversSRAM X.7 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Trek Top Fuel 69er Fork System Data

Derailleur (Front)Shimano LX
Derailleur (Rear)SRAM X-0
Fork material Single Crown
Aluminum and magnesium
Fork type 100 (millimeters) Travel
Fox F29 100RL

Other Specs of Trek Top Fuel 69er

Component group setsMountain Mix
Pedals detailsNot Available
Rear shock absorber 90 (millimeters) Travel
Fox Float RP2
Saddle seatBontrager Race
Seat post extensionBontrager Race Lite


Useful links and guides ....