Merlin CRITICAL PATH 1998 VS Trek TOP FUEL 9.9 2007 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Trek Top Fuel 9.9 2007 comparison online with competitors

Trek Top Fuel 9.9

General Infos
Model Top Fuel 9.9
Manufacturer Trek
Year of production 2007
Current price Check price Here ==>   
Color choice -Chi Red and Team
Sizes - 15.5 (inches)
- 17.5 (inches)
- 19.5 (inches)
- 21.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Schwalbe Fast Fred
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Hydraulic Levers
Shimano XTR With 6 (inches) Rotor Front and Shimano XTR With 5 (inches) Rotor Rear Brakes
Hubs for disc brakesBontrager Race X Lite
Rims manufacturerBontrager Race X Lite
Spoke nipples typeNot Available
Spoke wheelBontrager

Frame and Body Specs

Frame materialsOCLV 110 Carbon With ZR 9000 Swingarm
Frame typeTIG-welded and Monocoque
Handlebar constructionBontrager Race XXX Lite
Handlebar extenderOptional
Handlebar stem detailsBontrager Race XXX Lite
Headset sizeCane Creek S-8

Gearing Specifications

Bicycle chainNot Available
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 22/32/44 Teeth
Shimano XTR
Gear shift leversShimano XTR
Rear gear set 11 - 32 Teeth
9-speed

Trek Top Fuel 9.9 Fork System Data

Derailleur (Front)Shimano XTR
Derailleur (Rear)Shimano XTR
Fork material Single Crown
Aluminum and magnesium
Fork type 100 (millimeters) Travel
Manitou R7 Platinum

Other Specs of Trek Top Fuel 9.9

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 90 (millimeters) Travel
Manitou S-Type SRL
Saddle seatBontrager Race X Lite Pro
Seat post extensionBontrager Race X Lite ACC


Useful links and guides ....