Merlin CRITICAL PATH 1998 VS Univega DS-950 2000 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Univega DS-950 2000 comparison online with competitors

Univega DS-950

General Infos
Model DS-950
Manufacturer Univega
Year of production 2000
Current price Check price Here ==>   
Color choice -Anodized Silver and Fireball Orange
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire26 X 2.25 (inches) Geax Sedona
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid SD-1.9 L Levers
Formula MD-1 Brakes
Hubs for disc brakesFormula DC-61
Rims manufacturer 32-hole
Vuelta Excalibur
Spoke nipples typeNot Available
Spoke wheel 2.0 (millimeters)
Stainless Steel

Frame and Body Specs

Frame materials7000 aluminum c
Frame typeTIG-welded
Handlebar constructionAlloy
Handlebar extenderOptional
Handlebar stem detailsAlloy
Headset size1 1/8 (inches) Threadless WTB Momentum Comp ST

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC Z9000
Bottom bracket shell widthNot Available
Bottom bracket typeCartridge
Crankset parts and sizes 22/32/42 Teeth
TruVativ Firex Cold Forged
Gear shift leversShimano Deore
Rear gear set 11 - 32 Teeth
9-speed

Univega DS-950 Fork System Data

Derailleur (Front)Shimano Deore LX
Derailleur (Rear)Shimano Deore LX SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork type 3.0 (inches) Travel
Answer Manitou Magnum

Other Specs of Univega DS-950

Component group setsMountain Mix
Pedals detailsWellgo WPD-813 Clipless
Rear shock absorberRST 22A
Saddle seatWTB SSTX3 Tri-Tone
Seat post extensionAluminum Micro-adjust


Useful links and guides ....