Merlin CRITICAL PATH 1998 VS VooDoo CANZO AL XT/SID SL 1999 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


VooDoo Canzo Al XT/SID SL 1999 comparison online with competitors

VooDoo Canzo Al XT/SID SL

General Infos
Model Canzo Al XT/SID SL
Manufacturer VooDoo
Year of production 1999
Current price Check price Here ==>   
Color choice - Shaka Yellow
-Polished with Black rear triangle
Sizes - 14 (inches)
- 16 (inches)
- 17 (inches)
- 18.5 (inches)
- 19.5 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 2.10 (inches) WTB EnduroRaptor Kevlar
Front: 26 X 2.35 (inches) WTB EnduroRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore XT Levers
Shimano Deore XT V-Brake Brakes
Hubs for disc brakesShimano Deore XT Suspension
Rims manufacturer 32-hole
Mavic X517
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materialsEaston ProGram Elite Double-butted
Frame typeTIG-welded
Handlebar constructionTitec Enduro 141
Handlebar extenderOptional
Handlebar stem detailsTitec AL-PG
Headset size1 1/8 (inches) Threadless Aheadset AL

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG72
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN72
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore XT
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 11 - 32 Teeth
9-speed

VooDoo Canzo Al XT/SID SL Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano Deore XT Top-swing
Derailleur (Rear)Shimano Deore XT SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork type 3.15 (inches) Travel
Rock Shox Sid SL

Other Specs of VooDoo Canzo Al XT/SID SL

Component group setsShimano Deore XT
Pedals detailsShimano PD-M515 SPD
Rear shock absorber 4.0 (inches) Travel
Rock Shox Super Deluxe
Saddle seat Hollow Chromoly Rails
Koski Leather
Seat post extension 26.8 (millimeters) Diameter
Titec Aluminum


Useful links and guides ....