Merlin CRITICAL PATH 1998 VS VooDoo ZOBOP (26) 1998 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


VooDoo Zobop (26) 1998 comparison online with competitors

VooDoo Zobop (26)

General Infos
Model Zobop (26)
Manufacturer VooDoo
Year of production 1998
Current price Check price Here ==>   
Color choice -Serpent green and polished
Sizes - 15.5 (inches)
- 16 (inches)
- 17.25 (inches)
- 18.5 (inches)
- 19.5 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) IRC Mythos XC
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Real Levers
Shimano STX-RC V-Brake Brakes
Hubs for disc brakes Rear: Shimano STX-RC
Front: Real
Rims manufacturer 32-hole
Mavic X138
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials Double-butted
7005 Aluminum
Frame typeTIG-welded
Handlebar constructionTitec Enduro
Handlebar extenderOptional
Handlebar stem detailsTitec Aluminum
Headset size1 1/8 (inches) Threadless Aheadset ST

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Taya TB-600
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN52
Crankset parts and sizes 22/32/42 Teeth
Sugino Impel 500
Gear shift leversShimano STX-RC RapidFire SL
Rear gear set 11 - 30 Teeth
8-speed

VooDoo Zobop (26) Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano STX-RC Top-swing
Derailleur (Rear)Shimano Deore LX SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeAnswer Manitou SX-R

Other Specs of VooDoo Zobop (26)

Component group setsShimano STX-RC
Pedals detailsWellgo LU-970 With Clips & Straps
Rear shock absorber 4.0 (inches) Travel
Rock Shox Deluxe
Saddle seat Steel Rails
WTB SST
Seat post extension 31.8 (millimeters) Diameter
Titec Aluminum


Useful links and guides ....