Merlin CRITICAL PATH 1998 VS Yeti ASR 7 FREERIDE 2010 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Yeti ASR 7 Freeride
General InfosModel | ASR 7 Freeride |
Manufacturer | Yeti |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
- Turquoise - White -Black Ano |
Sizes |
- Small - medium - large - x-large |
Wheels And Breaking System
Bike front tire | 26 X 2.4 (inches) Schwalbe Fat Albert |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XT Levers Shimano XT Disc With 180 (millimeters) Rotor Front and Shimano XT Disc With 160 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | Rear: Mavic CrossLine 12 (millimeters) Thru-axle Front: Mavic CrossLine 20 (millimeters) Thru-axle |
Rims manufacturer | Mavic CrossLine |
Spoke nipples type | Not Available |
Spoke wheel | Wheelset Mavic |
Frame and Body Specs
Frame materials | Hydroformed 7005 Alloy |
Frame type | TIG-welded |
Handlebar construction | Easton DH |
Handlebar extender | Optional |
Handlebar stem details | Thomson X-4 |
Headset size | 1 1/2 (inches) To 1 1/8 (inches) Tapered Cane Creek S-3 |
Gearing Specifications
Bicycle chain | Shimano |
Bottom bracket shell width | 73 (millimeters) |
Bottom bracket type | Not Available |
Crankset parts and sizes | 22/36+bash Teeth Shimano SLX |
Gear shift levers | Shimano XT |
Rear gear set | 11 - 34 Teeth 9-speed |
Yeti ASR 7 Freeride Fork System Data
Derailleur (Front) | E-type Shimano SLX |
Derailleur (Rear) | Shimano XTR SGS Shadow |
Fork material | Single Crown Aluminum and magnesium |
Fork type | 160 (millimeters) Travel Fox 36 Float RC2 |
Other Specs of Yeti ASR 7 Freeride
Component group sets | Freeride Mix |
Pedals details | Not Available |
Rear shock absorber | 7 (inches) Travel Fox RP23 |
Saddle seat | SDG |
Seat post extension | 30.9 (millimeters) Diameter Thomson Elite |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Yeti ASR 7 Freeride manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Yeti ASR 7 Freeride Mountain bike here