Merlin CRITICAL PATH 1998 VS Yeti DH-9 PRO 2002 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |

Yeti DH-9 Pro
General InfosModel | DH-9 Pro |
Manufacturer | Yeti |
Year of production | 2002 |
Current price | Check price Here ==> |
Color choice |
- Turquoise -Team Colors |
Sizes |
- Large - medium - small |
Wheels And Breaking System
Bike front tire | 26 X 2.35 (inches) IRC Kujo |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Hayes Hydraulic Disk Levers Hayes Hydraulic Disk Brakes |
Hubs for disc brakes | Razor Rock Disc |
Rims manufacturer | 36-hole Mavic D321 Disc |
Spoke nipples type | Brass Nipples |
Spoke wheel | Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | 7005 Aluminum Main Triangle and 6061 Rear |
Frame type | TIG-welded |
Handlebar construction | Yeti Arc DH 1 1/2 (inches) Rise |
Handlebar extender | Optional |
Handlebar stem details | Answer Manitou MRD |
Headset size | 1 1/8 (inches) Threadless Cane Creek C2 |
Gearing Specifications
Bicycle chain | 1/2 X 1/8 (inches) Shimano |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano Cartridge |
Crankset parts and sizes | 42 Teeth Race Face North Shore XS |
Gear shift levers | Shimano Deore XT RapidFire SL |
Rear gear set | 11 - 27 Teeth 9-speed |
Yeti DH-9 Pro Fork System Data
Derailleur (Front) | Chain Retention Device |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum |
Fork type | 7.2 (inches) Travel Answer Manitou Dorado |
Other Specs of Yeti DH-9 Pro
Component group sets | Downhill Mix |
Pedals details | Shimano PD-M424 SPD |
Rear shock absorber | Fox Vanilla RC |
Saddle seat | Fi'zi:k: Dolomiti |
Seat post extension | Race Face Prodigy |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Yeti DH-9 Pro manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Yeti DH-9 Pro Mountain bike here