Univega ALPINA 606-S 1995 specs comparison
🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Univega Alpina 606-S price
Univega Alpina 606-S
General Infos| Model | Alpina 606-S |
| Manufacturer | Univega |
| Year of production | 1995 |
| Current price | 🛒 View Price → |
| Color choice | -Harvest and petrol |
| Sizes | - 14 (inches)- 17 (inches)- 19 (inches)- 20.5 (inches) |
Wheels And Breaking System
| Bike front tire | Rear: 26 X 2.00 (inches) Ritchey Climb MaxFront: 26 X 2.00 (inches) Ritchey Mad Max |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Dia-Compe PC-7 LeversShimano STX-RC M-System Brakes |
| Hubs for disc brakes | Shimano Deore LX |
| Rims manufacturer | 32-holeMavic 236 |
| Spoke nipples type | Brass Nipples |
| Spoke wheel | 2.0 (millimeters) Straight GaugeStainless Steel |
Frame and Body Specs
| Frame materials | Double-buttedChromoly |
| Frame type | TIG-welded Steel |
| Handlebar construction | Concept XL Alloy |
| Handlebar extender | Concept Pro Bend |
| Handlebar stem details | Concept Alloy |
| Headset size | 1 (inches) Dia-Compe S Series Aheadset |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-HG70 |
| Bottom bracket shell width | Not Available |
| Bottom bracket type | Not Available |
| Crankset parts and sizes | 24/34/42 TeethShimano STX-RC |
| Gear shift levers | Grip Shift SRT-600 |
| Rear gear set | 11 - 28 Teeth8-speed |
Univega Alpina 606-S Fork System Data
| Derailleur (Front) | Top-pullShimano STX |
| Derailleur (Rear) | Shimano Deore LX |
| Fork material | Triple-clamp CrownMagnesium |
| Fork type | Rock Shox Mag 21 |
Other Specs of Univega Alpina 606-S
| Component group sets | Shimano Deore LX |
| Pedals details | Wellgo LU-955A |
| Rear shock absorber | Not Available |
| Saddle seat | Leather CoverVetta SP Racing |
| Seat post extension | 26.0 (millimeters) DiameterConcept |
Useful links and guides ....
- Get your Univega Alpina 606-S manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Univega Alpina 606-S Mountain bike here