Mongoose BLACK DIAMOND TRIPLE 2007 VS Merlin CRITICAL PATH 1998 specs comparison

Mongoose Black Diamond Triple 2007 comparison online with competitors

Mongoose Black Diamond Triple

General Infos
Model Black Diamond Triple
Manufacturer Mongoose
Year of production 2007
Current price Check price Here ==>   
Color choice -Gloss White
Sizes - Small
- medium
- large
Sizes - Small
- medium
- large

Wheels And Breaking System

Bike front tire26 X 2.50 (inches) Kenda Nevegal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy 7 Levers
Avid Juicy 7 Hydraulic Disc With 8 (inches) Rotor Brakes
Hubs for disc brakes Rear: WTB Laser Disc Super Duty 150x12 (millimeters)
Front: WTB Laser Disc Super Duty 20 (millimeters)
Rims manufacturer 32-hole
WTB Laser Disc FR
Spoke nipples typeCP Brass
Spoke wheelWTB Stainless Steel

Frame and Body Specs

Frame materialsFreeDrive FR
Frame typeTIG-welded
Handlebar constructionEaston EA70 Lo Rise
Handlebar extenderOptional
Handlebar stem detailsEaston Havoc DH and FR
Headset sizeInternal

Gearing Specifications

Bicycle chainKMC Z9900
Bottom bracket shell widthNot Available
Bottom bracket typeFSA Mega EXO
Crankset parts and sizes 36 Teeth
FSA Gravity
Gear shift leversSRAM X.9 Impulse Trigger
Rear gear set 11 - 34 Teeth
9-speed

Mongoose Black Diamond Triple Fork System Data

Derailleur (Front)Not Available
Derailleur (Rear)SRAM X.9 Mid Cage
Fork material Dual Crown
Aluminum and magnesium
Fork type 140 - 180 (millimeters) Adjustable Travel
Marzocchi 66SL 1 ATA

Other Specs of Mongoose Black Diamond Triple

Component group setsDownhill Mix
Pedals detailsXpedo Sealed Bearing Alloy With Replaceable Pins
Rear shock absorber 170 - 190 (millimeters) Adjustable Travel
Fox DHX Air 4.0
Saddle seatSDG Bel Air ST
Seat post extensionTitec Knock Scoper I-Beam Telescopic


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....