Mongoose NX 9.7 1999 VS Merlin CRITICAL PATH 1998 specs comparison

Mongoose NX 9.7 1999 comparison online with competitors

Mongoose NX 9.7

General Infos
Model NX 9.7
Manufacturer Mongoose
Year of production 1999
Current price Check price Here ==>   
Color choice -Wired Orange
Sizes - Large
- medium
- small
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire26 X 2.25 (inches) IRC Backcountry
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Levers
Hayes Hydraulic Disc Brakes
Hubs for disc brakesMavic Dee Max Disc
Rims manufacturer 36-hole
Mavic Dee Max
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
Mavic Stainless Steel

Frame and Body Specs

Frame materialsAluminum
Frame typeTIG-welded
Handlebar constructionTitec Hell Bent DH
Handlebar extenderOptional
Handlebar stem detailsTitec Big AL
Headset size1 1/8 (inches) Threadless FSA

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-7700
Bottom bracket shell widthNot Available
Bottom bracket typeShimano BB-M952
Crankset parts and sizes 52 Teeth
Shimano XTR M951 DH
Gear shift leversShimano XTR RapidFire SL Rear
Rear gear set 11 - 32 Teeth
9-speed

Mongoose NX 9.7 Fork System Data

Derailleur (Front)Chain Retention Device
Derailleur (Rear)Shimano XTR
Fork material Double Triple-clamp Crown
Aluminum and magnesium
Fork type 6.0 (inches) Travel
Rock Shox Boxxer Pro

Other Specs of Mongoose NX 9.7

Component group setsShimano XTR
Pedals detailsShimano PD-M636 SPD
Rear shock absorber 7.0 (inches) Travel
Fox Vanilla RC
Saddle seatMongoose Beast
Seat post extensionTitec Hellbent


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....