Norco BOMBER 1997 VS Merlin CRITICAL PATH 1998 specs comparison

Norco Bomber 1997 comparison online with competitors

Norco Bomber

General Infos
Model Bomber
Manufacturer Norco
Year of production 1997
Current price Check price Here ==>   
Color choice -Orange
Sizes - Large
- medium
- small
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) Panaracer Duster II Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Magura Hydrostop Levers
Magura Hydraulic HS22 Brakes
Hubs for disc brakes Rear: Shimano Deore XT
Front: Shimano Deore XT Suspension
Rims manufacturer 32-hole
Mavic 221
Spoke nipples typeBrass Nipples
Spoke wheel 1.8 (millimeters) Double Butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materialsEaston Elan 3
Frame typeTIG-welded
Handlebar constructionTitec Enduro Hell Bent
Handlebar extenderOptional
Handlebar stem detailsAxiom Pro
Headset size1 1/8 (inches) Threadless Tange-Seiki DX-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG70
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 107 (millimeters) Spindle
Shimano BB-UN52
Crankset parts and sizes 22/32/44 Teeth
Race Face
Gear shift leversGrip Shift SRT-800 X-Ray
Rear gear set 11 - 30 Teeth
8-speed

Norco Bomber Fork System Data

Derailleur (Front) Top-pull and clamp-on 35.0 (millimeters)
Shimano Deore XT Top-swing
Derailleur (Rear)Shimano Deore XT SGS
Fork material Triple-clamp Crown
Aluminum
Fork typeMarzocchi Bomber Z-1

Other Specs of Norco Bomber

Component group setsShimano Deore XT
Pedals detailsAxiom VP 103 Clipless
Rear shock absorber 4.0 (inches) Travel
Risse LTR
Saddle seatSelle Italia Future
Seat post extension 26.8 (millimeters) Diameter
Axiom 6061


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....