Norco FLUID 1.0 2005 VS Merlin CRITICAL PATH 1998 specs comparison

Norco Fluid 1.0 2005 comparison online with competitors

Norco Fluid 1.0

General Infos
Model Fluid 1.0
Manufacturer Norco
Year of production 2005
Current price Check price Here ==>   
Color choice -Candy Blue
Sizes - Small
- medium
- large
Sizes - Small
- medium
- large

Wheels And Breaking System

Bike front tire26 X 2.30 (inches) Hutchinson Scorpion
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes HFX-9 Hydraulic Disc Front and Hayes HFX-9 Hydraulic Rear Levers
Hayes HFX-9 Hydraulic Disc Brakes
Hubs for disc brakesMavic Crossland
Rims manufacturer 32-hole
Mavic Crossland
Spoke nipples typeBrass Nipples
Spoke wheel 14ga. Straight Gauge
DT Swiss Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeMonocoque
Handlebar constructionTitec Hell Bent
Handlebar extenderOptional
Handlebar stem detailsTitec Big AL
Headset size1 1/8 (inches) Threadless FSA Orbit

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
SRAM PC-59
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 113 (millimeters) Spindle
TruVativ GIGA Pipe SL
Crankset parts and sizes 22/32/44 Teeth
TruVativ Stylo SL
Gear shift leversShimano Deore LX RapidFire
Rear gear set 11 - 34 Teeth
9-speed

Norco Fluid 1.0 Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 31.8 (millimeters)
Shimano Deore
Derailleur (Rear)Shimano Deore XT
Fork material Single Crown
Aluminum and magnesium
Fork type 115 - 145 (millimeters) Adjustable Travel
Manitou Nixon Elite

Other Specs of Norco Fluid 1.0

Component group setsMountain Mix
Pedals detailsCrank Brothers Candy
Rear shock absorber 4.5 (inches) - 5.5 (inches) Adjustable Travel
Fox Float RP3
Saddle seatSDG FRD I-Beam
Seat post extension 30.0 (millimeters) Diameter
Titec Scoper


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....