Norco FLUID ONE 2009 VS Merlin CRITICAL PATH 1998 specs comparison

Norco Fluid One
General InfosModel | Fluid One |
Manufacturer | Norco |
Year of production | 2009 |
Current price | Check price Here ==> |
Color choice |
-Red |
Sizes |
- Xsmall - small - medium - large - xlarge |
Sizes |
- Xsmall - small - medium - large - xlarge |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) Kenda Nevegal Stick E Rubber |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Elixer R Levers Avid Elixer R With 7 (inches) Rotor Front and Avid Elixer R With 6 (inches) Rotor Rear Brakes |
Hubs for disc brakes | 15 (millimeters) E-axle Rear: Shimano XT Front: Shimano XT |
Rims manufacturer | Mavic XM 317 |
Spoke nipples type | Not Available |
Spoke wheel | Not Available |
Frame and Body Specs
Frame materials | Hydraformed Aluminum |
Frame type | TIG-welded |
Handlebar construction | Ritchey WCS Carbon |
Handlebar extender | Optional |
Handlebar stem details | Thomson X-4 |
Headset size | 1 1/8 (inches) Threadless Crank Bros Direct Set |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano HG-73 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano XT |
Crankset parts and sizes | 22/32/44 Teeth Shimano XT |
Gear shift levers | Shimano XT |
Rear gear set | 11 - 34 Teeth 9-speed |
Norco Fluid One Fork System Data
Derailleur (Front) | 31.8 (millimeters) Clamp Shimano XT |
Derailleur (Rear) | Shimano XTR |
Fork material | Single |
Fork type | 100 - 140 (millimeters) Adjustable Travel Marzocchi 44 ATA |
Other Specs of Norco Fluid One
Component group sets | Shimano XT |
Pedals details | Shimano PD-M770 |
Rear shock absorber | 114 - 140 (millimeters) Adjustable Travel Fox Float RP23 |
Saddle seat | WTB Devo Team With NiCro Rails |
Seat post extension | 27.2 (millimeters) Diameter Thompson SP-E113 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Norco provided us with the latest version of its Fluid One bike manual
- Find All parts, tires and accessories of Norco Fluid One Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here