Norco SHORE ONE 2009 VS Merlin CRITICAL PATH 1998 specs comparison

Norco Shore One
General InfosModel | Shore One |
Manufacturer | Norco |
Year of production | 2009 |
Current price | Check price Here ==> |
Color choice |
-White |
Sizes |
- Small - medium - large |
Sizes |
- Small - medium - large |
Wheels And Breaking System
Bike front tire | 26 X 2.50 (inches) Kenda Nevegal Stick-E |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Elixer CR Levers Avid Elixer CR With 8 (inches) Rotor Brakes |
Hubs for disc brakes | 150 X 12 (millimeters) 20 (millimeters) Rear: Sun Jumping Flea Front: Sun Jumping Flea |
Rims manufacturer | 32-hole Sun Equalizer 29 (millimeters) |
Spoke nipples type | Not Available |
Spoke wheel | 14/15/14ga. Double-butted DT Swiss Competition Stainless Steel |
Frame and Body Specs
Frame materials | Hydraformed Aluminum |
Frame type | TIG-welded |
Handlebar construction | Funn Fatboy |
Handlebar extender | Optional |
Handlebar stem details | TruVativ Holzfeller |
Headset size | 1 1/2 (inches) Threadless FSA Orbit Extreme Pro |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) KMC X9 Gold Ti Nitrate |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ Ha (millimeters)erschmidt |
Crankset parts and sizes | TruVativ Ha (millimeters)erschmidt |
Gear shift levers | SRAM X.9 |
Rear gear set | 11 - 26 Teeth 9-speed |
Norco Shore One Fork System Data
Derailleur (Front) | Internally Geared Crank TruVativ Ha (millimeters)erschmidt |
Derailleur (Rear) | SRAM X.9 |
Fork material | Single |
Fork type | 180 (millimeters) Travel RockShox Totem Coil |
Other Specs of Norco Shore One
Component group sets | SRAM Mix |
Pedals details | DMR Magnesium |
Rear shock absorber | 175 (millimeters) Travel Fox DHX 3.0 |
Saddle seat | WTB Rocket V Comp |
Seat post extension | 30.9 (millimeters) Diameter Truvativ XR |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Norco provided us with the latest version of its Shore One bike manual
- Find All parts, tires and accessories of Norco Shore One Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here