Norco SIX ONE 2009 VS Merlin CRITICAL PATH 1998 specs comparison

Norco Six One 2009 comparison online with competitors

Norco Six One

General Infos
Model Six One
Manufacturer Norco
Year of production 2009
Current price Check price Here ==>   
Color choice -Red
Sizes - Small
- medium
- large
Sizes - Small
- medium
- large

Wheels And Breaking System

Bike front tire26 X 2.35 Kenda Nevegal Stick E Rubber
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Stroker Trail Levers
Hayes Stroker Trail With 8 (inches) Rotor Front and Hayes Stroker Trail With 7 (inches) Rotor Rear Brakes
Hubs for disc brakes 135 X 12 (millimeters)
20 (millimeters)
Rear: Sun Jumping Flea
Red
Red
Front: Sun Jumping Flea
Rims manufacturer 32-hole
Alex FD-28
Spoke nipples typeNot Available
Spoke wheel Double-butted
Stainless

Frame and Body Specs

Frame materialsHydraformed Aluminum
Frame typeTIG-welded
Handlebar constructionFunn Fatboy
Handlebar extenderOptional
Handlebar stem detailsFSA Gravity Lite
Headset size1 1/8 (inches) Threadless FSA Orbit MX-20

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC Z-9
Bottom bracket shell widthNot Available
Bottom bracket typeTruvativ Stylo GXP
Crankset parts and sizes 24/36 Teeth
TruVativ Stylo OCT With E-13 DRS
Gear shift leversSRAM X.9
Rear gear set 11 - 32 Teeth
9-speed

Norco Six One Fork System Data

Derailleur (Front)Shimano Deore
Derailleur (Rear)SRAM X.9
Fork materialSingle
Fork type 160 (millimeters) Travel
RockShox Lyric Solo R Air

Other Specs of Norco Six One

Component group setsSRAM Mix
Pedals detailsDMR V-12
Rear shock absorber 6 (inches) Travel
Marzocchi TST Air
Saddle seatNorco Shore
Seat post extension 30.9 (millimeters) Diameter
FSA Gravity DH-300


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....