Norco VPS SHORE 2004 VS Merlin CRITICAL PATH 1998 specs comparison
Norco VPS Shore
General InfosModel | VPS Shore |
Manufacturer | Norco |
Year of production | 2004 |
Current price | Check price Here ==> |
Color choice |
- Silver -Blue |
Sizes |
- Large - medium - small |
Sizes |
- Large - medium - small |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.50 (inches) Kenda Nevagal Front: 26 X 2.50 (inches) Kenda Blue Groove |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Hayes HFX Magnesium Hydraulic Disc Levers Hayes HFX Magnesium Hydraulic Disc Brakes |
Hubs for disc brakes | QR-20 Axle Rear: Formula DC-36 10 (millimeters) Thru-axle Front: Formula DH DC-91 |
Rims manufacturer | 32-hole Alex Supra D |
Spoke nipples type | Brass Nipples |
Spoke wheel | 14ga. Straight Gauge DT Stainless Steel |
Frame and Body Specs
Frame materials | 6061 T6 Aluminum |
Frame type | Monocoque |
Handlebar construction | TruVativ Holzfeller |
Handlebar extender | Optional |
Handlebar stem details | Marzocchi Integrated |
Headset size | 1 1/8 (inches) Threadless FSA The Pig DH |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) SRAM PC-59 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano Saint |
Crankset parts and sizes | 22/32 Teeth Shimano Saint |
Gear shift levers | Shimano Deore XT Rear and SRAM Rocket Shorty Front |
Rear gear set | 11 - 34 Teeth 9-speed |
Norco VPS Shore Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 31.8 (millimeters) Shimano Deore LX |
Derailleur (Rear) | Shimano Saint SGS |
Fork material | Dual Crown Aluminum |
Fork type | 177 (millimeters) Travel Marzocchi Super-T |
Other Specs of Norco VPS Shore
Component group sets | Downhill Mix |
Pedals details | TruVativ Holzfeller |
Rear shock absorber | 6.1 (inches) - 7.09 (inches) Adjustable Travel Fox Vanilla RC |
Saddle seat | Selle Italia Karve |
Seat post extension | 30.0 (millimeters) Diameter Titec Scoper |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Norco provided us with the latest version of its VPS Shore bike manual
- Find All parts, tires and accessories of Norco VPS Shore Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here