ProFlex ATTACK 1997 VS Merlin CRITICAL PATH 1998 specs comparison

ProFlex Attack 1997 comparison online with competitors

ProFlex Attack

General Infos
Model Attack
Manufacturer ProFlex
Year of production 1997
Current price Check price Here ==>   
Color choice - red and black
-Green and yellow
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Panaracer Duster II
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Chang Star 297 Levers
Chang Star 877AT Brakes
Hubs for disc brakes Rear: Shimano STX-RC
Front: Formula FM 11 Q and R
Rims manufacturer 32-hole
Weinmann Zac 19
Spoke nipples typeBrass Nipples
Spoke wheel 1.8 (millimeters) Straight Gauge
Chung Nan Stainless Steel

Frame and Body Specs

Frame materials Butted
7000 Aluminum
Frame typeTIG-welded
Handlebar constructionAluminum
Handlebar extenderGirvin
Handlebar stem detailsGirvin Forged
Headset size1 1/8 (inches) Threadless Dia-Compe Kontak Aheadset ST-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Sachs SC-40
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-LP26
Crankset parts and sizes 22/32/42 Teeth
Shimano Alivio
Gear shift leversSachs Power Grip Plus
Rear gear set 11 - 28 Teeth
8-speed

ProFlex Attack Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 31.8 (millimeters)
Shimano Alivio Top-swing
Derailleur (Rear)Shimano STX-RC
Fork material Triple-clamp Crown
Aluminum and chromoly
Fork typeRST 461

Other Specs of ProFlex Attack

Component group setsShimano STX-RC and Alivio
Pedals detailsWellgo LU-946S
Rear shock absorber 3.5 (inches) Travel
Girvin MCU
Saddle seatSelle San Marco Linea Pro
Seat post extension 27.2 (millimeters) Diameter
Polygon PM-312


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....