Rocky Mountain ALTITUDE 50 RSL 2010 VS Merlin CRITICAL PATH 1998 specs comparison
Rocky Mountain Altitude 50 RSL
General InfosModel | Altitude 50 RSL |
Manufacturer | Rocky Mountain |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-Black |
Sizes |
- 16.5 (inches) - 18 (inches) - 19.5 (inches) - 20.5 (inches) |
Sizes |
- 16.5 (inches) - 18 (inches) - 19.5 (inches) - 20.5 (inches) |
Wheels And Breaking System
Bike front tire | 26 (inches) Continental Mountain King |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Formula RX Levers Formula RX Disc With 180 (millimeters) Rotor Brakes |
Hubs for disc brakes | Rear: Shimano M525 Disc Front: Wheeltech Cartridge Disc 15 (millimeters) Axle |
Rims manufacturer | Mavic XM317 Disc |
Spoke nipples type | Not Available |
Spoke wheel | DT Swiss Competition |
Frame and Body Specs
Frame materials | RMB FORM Carbon C12 With Aluminum Chainstays |
Frame type | Monocoque |
Handlebar construction | 660 (millimeters) RaceFace Evolve XC Low Rise |
Handlebar extender | Optional |
Handlebar stem details | 660 (millimeters) RaceFace Evolve XC Low Rise |
Headset size | FSA Orbit CS |
Gearing Specifications
Bicycle chain | Shimano HG-53 |
Bottom bracket shell width | Not Available |
Bottom bracket type | RaceFace Evolve XC X-type |
Crankset parts and sizes | 22/32/44 Teeth RaceFace Evolve XC |
Gear shift levers | Shimano SLX |
Rear gear set | 11 - 34 Teeth 9-speed |
Rocky Mountain Altitude 50 RSL Fork System Data
Derailleur (Front) | DMD Shimano SLX |
Derailleur (Rear) | Shimano XT |
Fork material | Single Crown Magnesium and aluminum |
Fork type | 140 (millimeters) Travel Fox 32 Float RL |
Other Specs of Rocky Mountain Altitude 50 RSL
Component group sets | Mountain Mix |
Pedals details | Shimano PD-M520 |
Rear shock absorber | 140 (millimeters) Travel Fox Float RP23 |
Saddle seat | WTB Silverado Race SL |
Seat post extension | 30.9 (millimeters) Diameter Race Face Evolve XC |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Rocky Mountain provided us with the latest version of its Altitude 50 RSL bike manual
- Find All parts, tires and accessories of Rocky Mountain Altitude 50 RSL Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here