Rocky Mountain SLAYER SXC 70 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Rocky Mountain Slayer SXC 70 2010 comparison online with competitors

Rocky Mountain Slayer SXC 70

General Infos
Model Slayer SXC 70
Manufacturer Rocky Mountain
Year of production 2010
Current price Check price Here ==>   
Color choice -White and Red
Sizes - 15 (inches)
- 16.5 (inches)
- 18 (inches)
- 19 (inches)
- 20.5 (inches)
Sizes - 15 (inches)
- 16.5 (inches)
- 18 (inches)
- 19 (inches)
- 20.5 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 2.25 (inches) Maxxis Advantage
Front: 26 X 2.4 (inches) Maxxis Advantage
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Formula The ONE Hydraulic Levers
Formula The ONE Hydraulic With 180 (millimeters) Rotor Brakes
Hubs for disc brakes Rear: Shimano XT Disc
Front: Wheeltech Cartridge Disc 20 (millimeters) Axle
Rims manufacturerMavic XM317
Spoke nipples typeNot Available
Spoke wheelDT Swiss Competition

Frame and Body Specs

Frame materialsRMB FORM 7005 Aluminum With Carbon Seatstays
Frame typeTIG-welded
Handlebar constructionEaston EA70 Lo Rise 685 (millimeters)
Handlebar extenderOptional
Handlebar stem detailsEaston EA90
Headset sizeFSA Orbit MX

Gearing Specifications

Bicycle chainSRAM PC-970
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face Atlas AM X-Type
Crankset parts and sizes 22/32/44 Teeth
RaceFace Atlas AM
Gear shift leversSRAM X.9 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Rocky Mountain Slayer SXC 70 Fork System Data

Derailleur (Front) Clamp On 31.8 (millimeters)
SRAM X.7
Derailleur (Rear)SRAM X.9
Fork material Single Crown
Magnesium and aluminum
Fork type 160 (millimeters) Travel
Fox 36 Talas R II

Other Specs of Rocky Mountain Slayer SXC 70

Component group setsSRAM X.9/mix
Pedals detailsNot Available
Rear shock absorber 160 (millimeters) Travel
Fox DHX Air 5.0
Saddle seatSDG Bel Air
Seat post extension 30.9 (millimeters) Diameter
Easton EA70


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....