Rocky Mountain SWITCH S3 2005 VS Merlin CRITICAL PATH 1998 specs comparison

Rocky Mountain Switch S3 2005 comparison online with competitors

Rocky Mountain Switch S3

General Infos
Model Switch S3
Manufacturer Rocky Mountain
Year of production 2005
Current price Check price Here ==>   
Color choice -Shore Green
Sizes - 16.5 (inches)
- 18 (inches)
- 19.5 (inches)
Sizes - 16.5 (inches)
- 18 (inches)
- 19.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.50 (inches) Maxxis Minion DH
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes HFX-9 Hydraulic Disc Front and Hayes HFX-9 Hydraulic Rear Levers
Hayes HFX-9 Hydraulic Disc Brakes
Hubs for disc brakes Rear: RMB 20 (millimeters)
Front: RMB Thru-axle
Rims manufacturer 32-hole
Mavic EX 729D
Spoke nipples typeNot Available
Spoke wheelDT Swiss Champion Stainless Steel

Frame and Body Specs

Frame materialsEaston 7005 RAD DH Taperwall
Frame typeTIG-welded
Handlebar constructionRaceFace Diabolous
Handlebar extenderOptional
Handlebar stem detailsRace Face Diabolus
Headset size1 1/8 (inches) Threadless FSA The Pig DH Pro

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
SRAM PC-59
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face Diabolus X-Type
Crankset parts and sizesRaceFace Diabolous X-Type
Gear shift leversSRAM 7.0 Trigger
Rear gear set9-speed

Rocky Mountain Switch S3 Fork System Data

Derailleur (Front)Shimano Deore LX
Derailleur (Rear)SRAM 9.0
Fork material Single Crown
Aluminum
Fork type 152 (millimeters) Travel
Marzocchi 66R QR20

Other Specs of Rocky Mountain Switch S3

Component group setsMountain Mix
Pedals detailsWellgo WAM
Rear shock absorber 152 (millimeters) Travel
Fox DHX 5.0
Saddle seatSDG Freeride
Seat post extensionRace Face Diabolus


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....