Salsa DOS NINER 2009 VS Merlin CRITICAL PATH 1998 specs comparison

Salsa Dos Niner 2009 comparison online with competitors

Salsa Dos Niner

General Infos
Model Dos Niner
Manufacturer Salsa
Year of production 2009
Current price Check price Here ==>   
Color choice -Slippery Silver
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire29 X 2.10 (inches) WTb Prowler SL
Bike rear tireNot Available
Bike wheel size29 (inches) Wheels
Brakeset type Shimano XT Hydraulic Levers
Shimano XT Disc With 180 (millimeters) Rotor Front and Shimano XT Disc With 160 (millimeters) Rotor Rear Brakes
Hubs for disc brakesShimano XT 6-bolt Disc
Rims manufacturer 32-hole
Salsa Semi 29'er Disc
Spoke nipples typeBrass
Spoke wheel 14/15ga. Double-butted
DT Swiss Competition Stainless

Frame and Body Specs

Frame materialsScandium
Frame typeTIG-welded
Handlebar constructionSalsa ProMoto Flat
Handlebar extenderOptional
Handlebar stem detailsSalsa Moto Ace S.U.L.
Headset size1 1/8 (inches) Cane Creek S-3

Gearing Specifications

Bicycle chainShimano HG93
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face X-Type
Crankset parts and sizes 22/32/44 Teeth
Race Face Deus
Gear shift leversShimano XT Rapid Fire
Rear gear set 11 - 34 Teeth
9-speed

Salsa Dos Niner Fork System Data

Derailleur (Front)Shimano XT
Derailleur (Rear)Shimano XT
Fork materialSingle
Fork type 80 (millimeters) Travel
RockShox Reba Race 29 (inches)

Other Specs of Salsa Dos Niner

Component group setsShimano XT
Pedals detailsNot Available
Rear shock absorber 1 (inches) Travel
Salsa Relish Air
Saddle seatWTB Rocket V
Seat post extensionSalsa Shaft


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....