Santa Cruz BULLIT R FREERIDE 2003 VS Merlin CRITICAL PATH 1998 specs comparison
Santa Cruz Bullit R Freeride
General InfosModel | Bullit R Freeride |
Manufacturer | Santa Cruz |
Year of production | 2003 |
Current price | Check price Here ==> |
Color choice |
- Black - Duke Blue - Gunmetal Gray - Red - Rootbeer - Scuba Yellow - Trans Gold - Trans Red - White -Apple Green |
Sizes |
- Small - Medium - Large - Extra large |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.35 (inches) Intense |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Speed Dial 5 Levers Avid Mechanical Disc Brakes |
Hubs for disc brakes | Rear: DT Swiss Onyx Disc Front: White Industries 20 (millimeters) |
Rims manufacturer | 32-hole Mavic D321 Disc |
Spoke nipples type | Brass Nipples |
Spoke wheel | 14/15ga. Double-butted DT Stainless Steel |
Frame and Body Specs
Frame materials | 6061 T6 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Easton EA70 |
Handlebar extender | Optional |
Handlebar stem details | Titec Knucklehead DH |
Headset size | 1 1/8 (inches) Integrated Dia Compe HS0218 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG73 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 113 (millimeters) Spindle TruVativ GIGA Pipe DH |
Crankset parts and sizes | 22/32/44 Teeth TruVativ Holzfeller |
Gear shift levers | Shimano Deore Rapidfire |
Rear gear set | 11 - 34 Teeth 9-speed |
Santa Cruz Bullit R Freeride Fork System Data
Derailleur (Front) | Top-pull and clamp-on 35.0 (millimeters) Shimano Deore |
Derailleur (Rear) | Shimano Deore XT SGS |
Fork material | Dual Crown Aluminum and magnesium |
Fork type | 130 (millimeters) Travel Marzocchi Z-1 Freeride QR20+ |
Other Specs of Santa Cruz Bullit R Freeride
Component group sets | Mountain Mix |
Pedals details | Optional |
Rear shock absorber | 7.0 (inches) Travel Progressive 5th Element |
Saddle seat | WTB Laser V Race |
Seat post extension | 28.6 (millimeters) Diameter Easton EA70 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Santa Cruz provided us with the latest version of its Bullit R Freeride bike manual
- Find All parts, tires and accessories of Santa Cruz Bullit R Freeride Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here