Santa Cruz HECKLER (11) 1997 VS Merlin CRITICAL PATH 1998 specs comparison
Santa Cruz Heckler (11)
General InfosModel | Heckler (11) |
Manufacturer | Santa Cruz |
Year of production | 1997 |
Current price | Check price Here ==> |
Color choice |
- metallic green - polished - red - translucent blue - translucent red - wh -Black |
Sizes |
- 14 (inches) - 16 (inches) - 18 (inches) - 20 (inches) - 22 (inches) |
Sizes |
- 14 (inches) - 16 (inches) - 18 (inches) - 20 (inches) - 22 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 1.95 (inches) WTB Primal Raptor |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid SD-1.9 Levers Shimano Deore LX V-Brake Brakes |
Hubs for disc brakes | Rear: Shimano Deore LX Front: Rock Shox Boxxer |
Rims manufacturer | 32-hole Bontrager Red Label |
Spoke nipples type | Brass Nipples |
Spoke wheel | 2.0 (millimeters) Straight Gauge DT Stainless Steel |
Frame and Body Specs
Frame materials | 6061 T6 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Titec PG |
Handlebar extender | Optional |
Handlebar stem details | Kore Lite |
Headset size | 1 1/8 (inches) Threadless Dia-Compe Aheadset |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG70 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 107 (millimeters) Spindle Shimano BB-UN52 |
Crankset parts and sizes | 22/32/42 Teeth White Industries |
Gear shift levers | Grip Shift SRT-800 X-Ray |
Rear gear set | 11 - 28 Teeth 8-speed |
Santa Cruz Heckler (11) Fork System Data
Derailleur (Front) | Top-pull and clamp-on 31.8 (millimeters) Shimano Deore LX Top-swing |
Derailleur (Rear) | Shimano Deore XT SGS |
Fork material | Double Triple-clamp Crown Magnesium |
Fork type | Rock Shox Judy DHO |
Other Specs of Santa Cruz Heckler (11)
Component group sets | Shimano Deore XT and LX |
Pedals details | Optional |
Rear shock absorber | 4.0 (inches) Travel Fox Vanilla R |
Saddle seat | Selle San Marco Bontrager With Chromoly Rails |
Seat post extension | 26.8 (millimeters) Diameter Titec AL-235 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Santa Cruz provided us with the latest version of its Heckler (11) bike manual
- Find All parts, tires and accessories of Santa Cruz Heckler (11) Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here