Santa Cruz HECKLER XTR 2000 VS Merlin CRITICAL PATH 1998 specs comparison

Santa Cruz Heckler XTR 2000 comparison online with competitors

Santa Cruz Heckler XTR

General Infos
Model Heckler XTR
Manufacturer Santa Cruz
Year of production 2000
Current price Check price Here ==>   
Color choice - Lime Green
- Metallic Blue
- Metallic Green
- Orange
- Polished
- Red
- Silver
- Trans Red - Trans Blue
- White
- Yellow
-Black
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) IRC Mythos XC Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type SRAM 9.0 SL Levers
Avid 1D-25 Brakes
Hubs for disc brakes Rear: Shimano XTR
Front: White Industries
Rims manufacturer 32-hole
Rear: Bontrager Valiant Assymetric
Front: Bontrager Valiant
Spoke nipples typeAlloy Nipples
Spoke wheel Double-butted
DT Revolution Stainless Steel

Frame and Body Specs

Frame materials Double-butted
6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionEaston Monkey Bar
Handlebar extenderOptional
Handlebar stem detailsTitec Big AL
Headset size1 1/8 (inches) Threadless Race Face Real Seal

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG92
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M952
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M952
Gear shift leversShimano XTR RapidFire SL
Rear gear set 12 - 34 Teeth
9-speed

Santa Cruz Heckler XTR Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano XTR Top-swing
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum
Fork type 4.0 (inches) Travel
Marzocchi Bomber Z-1 X-Fly

Other Specs of Santa Cruz Heckler XTR

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 4.0 (inches) Travel
Fox Float R
Saddle seatFi'zi:k: Nisene Ti
Seat post extension 27.2 (millimeters) Diameter
Easton CT2


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....