Schwinn HOMEGROWN FACTORY SUSPENSION 1996 VS Merlin CRITICAL PATH 1998 specs comparison

Schwinn Homegrown Factory Suspension 1996 comparison online with competitors

Schwinn Homegrown Factory Suspension

General Infos
Model Homegrown Factory Suspension
Manufacturer Schwinn
Year of production 1996
Current price Check price Here ==>   
Color choice -Polished
Sizes - 17 (inches)
- 19 (inches)
- 21 (inches)
Sizes - 17 (inches)
- 19 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 1.95 (inches) Tioga Psycho TT Kevlar
Front: 26 X 1.95 (inches) Tioga Psycho K Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore XT Levers
Shimano Deore XT V-Brake Brakes
Hubs for disc brakesNot Available
Rims manufacturer 32-hole
Sun Metal CR17A
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double Butted
DT Competition Stainless Steel

Frame and Body Specs

Frame materials Butted
6061 T6 Aluminum
Frame typeWelded Aluminum
Handlebar constructionControl Tech Aluminum
Handlebar extenderControl Tech Stix Team Issue
Handlebar stem detailsControl Tech
Headset size1 1/8 (inches) Threadless Tioga DX Alloy

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Sachs SCM55
Bottom bracket shell width73 (millimeters) English
Bottom bracket type 107 (millimeters) Spindle
Shimano BB-UN72
Crankset parts and sizes 22/32/42 Teeth
White Industries
Gear shift leversGrip Shift ESP 900
Rear gear set 11 - 28 Teeth
8-speed

Schwinn Homegrown Factory Suspension Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano Deore XT Top-swing
Derailleur (Rear)Grip Shift ESP 900
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Judy XC

Other Specs of Schwinn Homegrown Factory Suspension

Component group setsGrip Shift and Shimano Deore XT
Pedals detailsShimano PD-M535 SPD
Rear shock absorber 3.75 (inches) Travel
Fox Alps-4R
Saddle seat Chromoly Rails
Schwinn San Marcos Homegrown
Seat post extension 26.8 (millimeters) Diameter
Control Tech Control Post


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....