Scorpio AT-200FX 1999 VS Merlin CRITICAL PATH 1998 specs comparison
Scorpio AT-200FX
General InfosModel | AT-200FX |
Manufacturer | Scorpio |
Year of production | 1999 |
Current price | Check price Here ==> |
Color choice |
-Steel and Banana |
Sizes |
- 18 (inches) - 20 (inches) |
Sizes |
- 18 (inches) - 20 (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.10 (inches) Kenda K-837 Front: 26 X 2.10 (inches) Kenda K-836 |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Chang Star 257A Levers Chang Star Linear-pull Brakes |
Hubs for disc brakes | Q and R Rear: Shimano Alivio Front: Joy Tech OS Aluminum |
Rims manufacturer | 36-hole Weinmann 519 |
Spoke nipples type | Brass Nipples |
Spoke wheel | 2.0 (millimeters) Straight Gauge Shuhn Lih Stainless Steel |
Frame and Body Specs
Frame materials | Chromoly |
Frame type | TIG-welded |
Handlebar construction | Hsin Lung Steel |
Handlebar extender | Optional |
Handlebar stem details | Tahoma Sonne IV |
Headset size | 1 1/8 (inches) Threadless YST CS558 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) KMC Z-51 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 110.5 (millimeters) Spindle Chin Haur CH-46 |
Crankset parts and sizes | 24/34/42 Teeth Tracer |
Gear shift levers | Shimano Alivio RapidFire SL |
Rear gear set | 11 - 28 Teeth 8-speed |
Scorpio AT-200FX Fork System Data
Derailleur (Front) | Top-pull and clamp-on 28.6 (millimeters) Pilot DX |
Derailleur (Rear) | Shimano Alivio |
Fork material | Triple-clamp Crown Chromoly and aluminum |
Fork type | 2.5 (inches) Travel Spinner |
Other Specs of Scorpio AT-200FX
Component group sets | Mountain Mix |
Pedals details | Wellgo LU-883 |
Rear shock absorber | 2.0 (inches) Travel Pilot JSF-718 |
Saddle seat | Pilot |
Seat post extension | 25.6 (millimeters) Diameter Kalloy SP-200 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Scorpio provided us with the latest version of its AT-200FX bike manual
- Find All parts, tires and accessories of Scorpio AT-200FX Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here