Scott RANSOM 10 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Scott Ransom 10 2010 comparison online with competitors

Scott Ransom 10

General Infos
Model Ransom 10
Manufacturer Scott
Year of production 2010
Current price Check price Here ==>   
Color choice -Black and Green
Sizes - S
- M
- L
- XL
Sizes - S
- M
- L
- XL

Wheels And Breaking System

Bike front tire26 X 2.40 (inches) Schwalbe Fat Albert Triple Compound
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Formula The ONE Hydraulic Levers
Formula The ONE Hydraulic With 203 (millimeters) Rotor Front and Formula The ONE Hydraulic With 185 (millimeters) Rotor Rear Brakes
Hubs for disc brakes 20 (millimeters)
Rear: Sun Ringle Jumping Flea 12 (millimeters)
Front: Scott EC Pro
Rims manufacturer 32-hole
DT Swiss 475d 28 (millimeters) Wide
Spoke nipples typeDT Swiss Prolock
Spoke wheel 14/16.5/15ga. Straight Gauge
DT Swiss Super Comp Stainless Steel

Frame and Body Specs

Frame materialsScott Ransom Concept CR1/HMX and 6061
Frame typeTIG-welded
Handlebar constructionScott Pilot 30 Pro 7075 Alloy 30 (millimeters) Rise and 690 (millimeters)
Handlebar extenderOptional
Handlebar stem detailsScott EC 6-degree
Headset size1 1/8 (inches) Semi-ntegrated Ritchey Pro 44/50 (millimeters)

Gearing Specifications

Bicycle chainSRAM PC 991
Bottom bracket shell width73 (millimeters)
Bottom bracket typeSRAM Ha (millimeters)erSchmidt
Crankset parts and sizesTruvativ Ha (millimeters)erschmidt AM
Gear shift leversSRAM X.9 Trigger With Matchmaker
Rear gear set 11 - 34 Teeth
9-speed

Scott Ransom 10 Fork System Data

Derailleur (Front) N and A
N and A
Derailleur (Rear)SRAM X.0 Carbon Short Cage
Fork materialSingle
Fork type 120 - 160 (millimeters) Adjustable Travel
Fox 36 Talas R

Other Specs of Scott Ransom 10

Component group setsMountain Mix
Pedals detailsOptional
Rear shock absorber 165 (millimeters) Travel
Scott Equalizer TC
Saddle seatScott Genius
Seat post extension 34.9 (millimeters) With Special Shim Diameter
Crank Brothers Joplin 3.1


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....