Scott RANSOM LIMITED 2007 VS Merlin CRITICAL PATH 1998 specs comparison
![Scott Ransom Limited 2007 comparison online with competitors](https://yobicycle.com/images/models/Scott-Ransom-Limited-2007-specs.jpg)
Scott Ransom Limited
General InfosModel | Ransom Limited |
Manufacturer | Scott |
Year of production | 2007 |
Current price | Check price Here ==> |
Color choice |
-Not found |
Sizes |
- Not available |
Sizes |
- Not available |
Wheels And Breaking System
Bike front tire | 26 X 2.40 (inches) Scott Stroke |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR Disc With 203 (millimeters) Rotor Front and Shimano XTR Disc With 180 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | Rear: DT Swiss 240 Disc 12 (millimeters) Thru Axle Front: Shimano XTR Thru Axle |
Rims manufacturer | 32-hole DT Swiss 5.1 Disc |
Spoke nipples type | Not Available |
Spoke wheel | DT Swiss Black |
Frame and Body Specs
Frame materials | Carbon |
Frame type | Monocoque |
Handlebar construction | TruVativ Team Carbon |
Handlebar extender | Optional |
Handlebar stem details | Thomson Elite X4 |
Headset size | Syncros Race |
Gearing Specifications
Bicycle chain | Shimano CN-HG93 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano XTR Hollowtech II |
Crankset parts and sizes | 22/32/44 Teeth Shimano XTR |
Gear shift levers | Shimano XTR Rapid Fire |
Rear gear set | 11 - 32 Teeth 9-speed |
Scott Ransom Limited Fork System Data
Derailleur (Front) | Shimano XTR |
Derailleur (Rear) | Shimano XTR |
Fork material | Single Crown Aluminum and magnesium |
Fork type | 115 - 160 (millimeters) Adjustable Travel RockShox Lyrik |
Other Specs of Scott Ransom Limited
Component group sets | Shimano XTR |
Pedals details | Crankbrothers Acid 2.0 |
Rear shock absorber | 165 (millimeters) Travel Scott Equalizer TC |
Saddle seat | Scott EC CR-MO |
Seat post extension | Maverick Speedball Adjustable |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Scott provided us with the latest version of its Ransom Limited bike manual
- Find All parts, tires and accessories of Scott Ransom Limited Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here